Distribution Centre Asbestos Roof Waterproofing

Distribution centres run on 24/7 schedules where roof shutdowns are not an option. Duratite encapsulates asbestos cement DC roofs with GacoFlex S42 silicone — applied entirely externally, with no disturbance to racking, conveyors, MHE or pickers below. Typical roofs are 10,000m² to 30,000m² profiled cement sheet on portal frames, with leaks at lap joints, hook-bolt rust and rooflight failure being the usual issues. We work around shift patterns and weather windows, often with parallel crews, to deliver a fully encapsulated, 20-year warranted weatherproof skin without taking the operation offline.

Why Encapsulate, Not Strip

Key Benefits

  • Zero impact on pick-pack-dispatch operations below
  • Phased delivery so the building is fully operational every working day
  • Eliminates leaks above conveyors, racking and high-value stock
  • Compliant with ROI and NI asbestos regulations — full asbestos management plan update on completion
  • 20-year manufacturer-backed product warranty
  • Parallel crews delivering 1,500–3,000m² per week on large schemes

The Process

  • Pre-survey site walk with operations team to map racking, dock doors, MHE and live zones
  • Programme split into roof bays aligned with internal layout to minimise overlap
  • RAMS, asbestos management plan update and ops communication pack issued
  • GacoWash clean-down with full effluent capture
  • Lap repair, fixing replacement, rooflight swap-out, GacoFlex S42 application in two coats
  • 20-year warranty + photographic and air-monitoring sign-off pack issued

Distribution Centre Asbestos Roof Waterproofing FAQs

Yes. We routinely run distribution centre installations to weekly, weekend or shift-pattern schedules. The team works in agreed roof bays aligned with the internal racking layout so MHE, pickers and dispatch can stay live below. Out-of-hours working is priced openly in the quote.
We agree exclusion zones with operations before the day starts, place spotters at active dock doors and run lifting and access activity outside of yard peak hours. All material is hoisted using the agreed lift plan in the RAMS rather than transported through the building.
Typically 8–14 weeks of weather-permitting working time with two parallel crews, depending on roof complexity, rooflight replacement scope and access restrictions. Phased programmes can compress this further when night working is acceptable.
Yes. The 20-year manufacturer-backed warranty transfers with the freehold or long lease on sale, subject to a one-off transfer fee and confirmation of the condition of the roof at point of transfer. Documentation is supplied in a format ready for sale due diligence.
Large distribution centre asbestos cement roofs are priced after a free site survey, including rooflight replacement and the 20-year warranty. Phased multi-DC programmes for the same operator attract per-m² volume discounts.

Free Distribution Centre Asbestos Roof Survey

Duratite delivers commercial asbestos roof waterproofing for distribution centre projects across Ireland and Northern Ireland. GacoFlex S42 with a 20-year manufacturer-backed warranty.

Request Free Survey info@duratite.ie
Free Site Survey

Get a Free Site Survey & Quote

Tell us about your building and we’ll recommend the right system — foam, waterproofing or both — surveyed, specified and quoted at no cost.

  • Reviewed by a Duratite specialist
  • No obligation, no hard sell
  • One team from survey to warranty
  • Ireland and Northern Ireland coverage